Public Comment Form

2026-Q4-16 D-2013-007-CP3 Parkland School District

An application to approve the applicant's proposed construction project of two (2) new sequencing batch reactors (SBR), new tertiary filter, new ultraviolet disinfection, and ancillary equipment to increase the design hydraulic capacity to 55,000 gallons per day (gpd) average (0.55 million gallons per day (mgd)), 82,500 gpd (0.0825 mgd) peak, and organic capacity to 80 pounds per day 5 day Carbonaceous Biochemical Oxygen Demand (CBOD5). Currently, the wastewater treatment plant (WWTP) is not able to meet its current National Pollutant Discharge Elimination System (NPDES) Permit limits for Total Nitrogen due to an increased organic and hydraulic loading to the WWTP that currently exceeds the original design. The WWTP will continue to discharge treated effluent into Jordan Creek, a tributary of the Lehigh River, at River Mile 183.7 - 16.3 - 8.6 (Delaware River - Lehigh River - Jordan Creek), via Outfall No. 001, located in South Whitehall Township, Lehigh County, Pennsylvania, within the drainage area of the section of the non-tidal Delaware River known as the Lower Delaware, which is classified as Special Pr



Contact Information

*Indicates Required Fields

Submitted by Value

First Name *

Last Name *

Address

City

State

ZIP

Email *

Your Comment


Enter your comments below for docket D-2013-007-CP3 Parkland School District.


*Uploading a file is optional*

You may attach up to five 20 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx, xlsx, xls. If you experience technical difficulties submitting your comment please contact the person listed at the bottom of this page.