An application to renew the approval of an existing 580 megawatt (MW) electric generating facility including the consumptive use of up to 4.0 million gallons per day (mgd) and the discharge of 0.4 mgd of cooling tower blowdown. Water required for the operation of the facility will continue to be provided by the Reading Area Water Authority. Cooling tower blowdown will continue to be discharged to the Schuylkill River at River Mile 92.5 - 86.1 (Delaware River - Schuylkill River) via Outfall No. 001. The project is located in Ontelaunee Township, Berks County, Pennsylvania.
Contact Information
*Indicates Required Fields
Thank you for subscribing to the 2026-Q4-04 D-2000-014-2 Vistra Corp mailing list.
An application to renew the approval of an existing 580 megawatt (MW) electric generating facility including the consumptive use of up to 4.0 million gallons per day (mgd) and the discharge of 0.4 mgd of cooling tower blowdown. Water required for the operation of the facility will continue to be provided by the Reading Area Water Authority. Cooling tower blowdown will continue to be discharged to the Schuylkill River at River Mile 92.5 - 86.1 (Delaware River - Schuylkill River) via Outfall No. 001. The project is located in Ontelaunee Township, Berks County, Pennsylvania.
Contact Information
*Indicates Required Fields